Question
# 1 of 8 ( Start time: 07:32:00 PM ) Total Marks: 1
………….
theory when the deliverables of a project are more important than its phases.
This normally happens when the deliverables are decided before the project
begins.
Select
correct option:
Project
life-cycle-based
Scheduled
None
of given
Deliverable-based (handouts pdf file, page 277)
Question
# 2 of 8
Predecessor
activities need to ------------ before the next can begin. After a predecessor
activity is completed, the successor activity becomes the predecessor for
another activity.
Select
correct option:
Both
start and end
End (handouts, page 297)
Start
None
of given
Question
# 3 of 8
Each
…………. can be subdivided into sub tasks.
Select
correct option:
None
of given
Program
Task (handouts, page 275)
Project
Question
# 4 of 8
Using
PERT and CPM, -----------------------, helps you complete a project on time. By
using these techniques, you can determine the latest time by when an activity
should start to be completed on time.
Select
correct option:
Individually
Combination
Individual and Combine (handouts, page 296)
None
of given
Question
# 5 of 8 ( Start time: 07:34:55 PM ) Total Marks: 1
Over
the course of the project, a comparison of the due date and the date delivered
provides a metric for how well deliverable dates are ………………. by the project
team.
Select
correct option:
Met (handouts, page 274)
Scheduled
None
of given
Changed
Question
# 6 of 8
Risk
analysis and management are a series of steps that help a software team to
understand and manage ------------------------.
Select
correct option:
Uncertainty (handouts, page 305)
Crises
None
of given
Problem
Question
# 7 of 8 ( Start time: 07:36:07 PM ) Total Marks: 1
A
node on a network schedule is that point in time at which an activity
----------------.
Select
correct option:
Begins
Begins or Ends (handouts, page 297)
Ends
None
of given
Question
# 8 of 8
To
------------------- risks from occurring, the project team prepares the risk
plan before the commencement of the project.
Select
correct option:
Avoid (handouts, page 312)
Deal
None
of given
Manage
______is
the technical kernel of software engineering
• Design
• Implementation
• Requirements analysis
• Testing
These all are outputs of Initiating Process except
• Project Manager Assignments
• Constraints
• Selection Criteria
• Assumptions
Project management processes can be organized into _____________ groups
• Four
• Five
• Six
• Seven
Product quality depends on its conformance to ______
• Software requirements
• Development standards
• Implicit requirements
• All of given
Finally, the specification includes a ________
• Bibliography
• Appendix
• Both Bibliography and Appendix
• Reference
Cognitive model describes a system as perceived by its _________
• User community
• Developer
• Top level management
• Manager
The model serves as the basis for the creation of ________ for the Software.
• Design
• Maintenance
• Testing
• Specifications
Throughout evaluation and solution synthesis, the analyst's primary focus is on
• "What, not "how."
• Model
• Evaluation and Synthesis
• Specification
A software project that meets all the stated objectives is a success of _________
• Project quality
• Project fundamental purpose
• Project management myth
• Project requirement
All of the following describe the activity list except:
• It’s an extension of the WBS
• It include all activities of the project
• It describe the WBS update
• It include a description of project activities
Project management is a _________of constant communication and negotiation.
• ßProcess
• Concept
• Practice
• None of given
Efficiency with which a program runs on different platforms or operating systems is Reusability
• TRUE
• FALSE
-------------------is a software engineering task that bridges the gap between system level requirements engineering and software design.
• Cost Analysis
• Design analysis
• Risk analysis
• Requirements analysis
---------- is path finding,----------- is path following
• Leadership, Management
• Leader, Leadership
• Management, Leadership
• Manager, Management
________ identifying which quality standards are relevant to the project and determining how to satisfy them.
• Quality Planning
• Communications Planning
• Organization Planning
• Staff Acquisition
These all are outputs of Initiating Process except
• Project Manager Assignments
• Constraints
• Selection Criteria
• Assumptions
Mode of specification has a great impact on quality of solution. Forcing SWE to work with incomplete, inconsistence, or misleading specifications result in frustration and confusion affecting:
Quality
Timeliness and
Completeness of SW product
All of given
A review of the Software Requirements Specification is conducted by ________
• Software developer
• Customer
• Both the software developer and the customer
• Top level management
A meeting is conducted at a _________ and attended by both software engineers and customers.
• Software engineer site
• Neutral site
• Customer site
• Company site
In problem evaluation area of effort, once problems have been identified, the ___________determines what information is to be produced by the new system and what data will be provided to the system.
• Analyst
• Designer
• Coder
• Manager
Requirements are refined and analyzed to assess their clarity, completeness, and_______
• Correctness
• Consistency
• Concurrency
• None of given
Software project are carried out sequentially and that each phase is completed before the next is taken up.
• The Prototyping Model
• The Incremental Model
• The Waterfall model
• The Spiral model
These all are design phase activities except
• Output Design
• Input Design
• The software test plan
• Software Selection
Which organization has set the de facto standards for project management techniques?
• PMBOK
• PMI
• PMA
• PMO
Please choose one Efficiency with which a program runs on different platforms or operating systems is Reusability
• True
• False
Please choose one During the Implementation phase the software modules are coded and initial unit tests are performed
• True
• False
Please choose one -------------------is a software engineering task that bridges the gap between system level requirements engineering and software design.
• Cost Analysis
• Design analysis
• Risk analysis
• Requirements analysis
Please choose one ---------- is path finding,----------- is path following
• Leadership, Management
• Leader, Leadership
• Management, Leadership
• Manager, Management
The first activity in risk analysis is risk management.
• True
• False
If you are given a Software Project to manage, what steps you will consider for planning of the project. During the Implementation phase the software modules are coded and initial unit tests are performed.
• True
• False
Both the software engineer and customer take an active role in software requirements engineering-a set of activities that is often referred to as Requirement
• Managing
• Recognition
• Analysis
• Modeling
The Efficiency with which a program runs on different platforms or operating systems is called :
• Portability
• Reusability
• Configurability
• Interoperability
---Quiz
The final activity for a project manager is___________
• Project closedown
• Project implementation
• Project execution
• Project Quality
Project Quality Management includes the --------------- required to ensure that the project will satisfy the needs for which it was undertaken
• Time
• Cost
• Processes
• None of the given
We can classify the problems that affect software projects into _________ categories
• 3
• 4
• 5
• 6
All given below are the problems that affect software projects except:
• Product-related problems
• Technology-related problems
• Procedure-related problems
• People-related problems
--------------completion and settlement of the contract, including resolution of any open items.
• Contract Administration
• Source Selection
• None of the given
• Contract Closeout
Insufficient identification is a
• Technology-related problems
• Process-related problems
• People-related problems
• Product-related problems
Inefficient project management style is a
• Product-related problems
• Technology-related problems
• Process-related problems
• People-related problems
Unproductive work environment is a
• Technology-related problems
• Process-related problems
• People-related problems
• Product-related problems
__________contains an analysis of what went wrong, what went right, and what you could have done better in the software project.
• Prepare closedown report
• Identify learning
• Identify reusable software components
• Create reference material:
Decisions also have a --------------------- element to them—the “right” decision may not be the “best” decision if it is made too early or too late.
• Cost
• Quality
• Design
• Implementation
• Requirements analysis
• Testing
These all are outputs of Initiating Process except
• Project Manager Assignments
• Constraints
• Selection Criteria
• Assumptions
Project management processes can be organized into _____________ groups
• Four
• Five
• Six
• Seven
Product quality depends on its conformance to ______
• Software requirements
• Development standards
• Implicit requirements
• All of given
Finally, the specification includes a ________
• Bibliography
• Appendix
• Both Bibliography and Appendix
• Reference
Cognitive model describes a system as perceived by its _________
• User community
• Developer
• Top level management
• Manager
The model serves as the basis for the creation of ________ for the Software.
• Design
• Maintenance
• Testing
• Specifications
Throughout evaluation and solution synthesis, the analyst's primary focus is on
• "What, not "how."
• Model
• Evaluation and Synthesis
• Specification
A software project that meets all the stated objectives is a success of _________
• Project quality
• Project fundamental purpose
• Project management myth
• Project requirement
All of the following describe the activity list except:
• It’s an extension of the WBS
• It include all activities of the project
• It describe the WBS update
• It include a description of project activities
Project management is a _________of constant communication and negotiation.
• ßProcess
• Concept
• Practice
• None of given
Efficiency with which a program runs on different platforms or operating systems is Reusability
• TRUE
• FALSE
-------------------is a software engineering task that bridges the gap between system level requirements engineering and software design.
• Cost Analysis
• Design analysis
• Risk analysis
• Requirements analysis
---------- is path finding,----------- is path following
• Leadership, Management
• Leader, Leadership
• Management, Leadership
• Manager, Management
________ identifying which quality standards are relevant to the project and determining how to satisfy them.
• Quality Planning
• Communications Planning
• Organization Planning
• Staff Acquisition
These all are outputs of Initiating Process except
• Project Manager Assignments
• Constraints
• Selection Criteria
• Assumptions
Mode of specification has a great impact on quality of solution. Forcing SWE to work with incomplete, inconsistence, or misleading specifications result in frustration and confusion affecting:
Quality
Timeliness and
Completeness of SW product
All of given
A review of the Software Requirements Specification is conducted by ________
• Software developer
• Customer
• Both the software developer and the customer
• Top level management
A meeting is conducted at a _________ and attended by both software engineers and customers.
• Software engineer site
• Neutral site
• Customer site
• Company site
In problem evaluation area of effort, once problems have been identified, the ___________determines what information is to be produced by the new system and what data will be provided to the system.
• Analyst
• Designer
• Coder
• Manager
Requirements are refined and analyzed to assess their clarity, completeness, and_______
• Correctness
• Consistency
• Concurrency
• None of given
Software project are carried out sequentially and that each phase is completed before the next is taken up.
• The Prototyping Model
• The Incremental Model
• The Waterfall model
• The Spiral model
These all are design phase activities except
• Output Design
• Input Design
• The software test plan
• Software Selection
Which organization has set the de facto standards for project management techniques?
• PMBOK
• PMI
• PMA
• PMO
Please choose one Efficiency with which a program runs on different platforms or operating systems is Reusability
• True
• False
Please choose one During the Implementation phase the software modules are coded and initial unit tests are performed
• True
• False
Please choose one -------------------is a software engineering task that bridges the gap between system level requirements engineering and software design.
• Cost Analysis
• Design analysis
• Risk analysis
• Requirements analysis
Please choose one ---------- is path finding,----------- is path following
• Leadership, Management
• Leader, Leadership
• Management, Leadership
• Manager, Management
The first activity in risk analysis is risk management.
• True
• False
If you are given a Software Project to manage, what steps you will consider for planning of the project. During the Implementation phase the software modules are coded and initial unit tests are performed.
• True
• False
Both the software engineer and customer take an active role in software requirements engineering-a set of activities that is often referred to as Requirement
• Managing
• Recognition
• Analysis
• Modeling
The Efficiency with which a program runs on different platforms or operating systems is called :
• Portability
• Reusability
• Configurability
• Interoperability
---Quiz
The final activity for a project manager is___________
• Project closedown
• Project implementation
• Project execution
• Project Quality
Project Quality Management includes the --------------- required to ensure that the project will satisfy the needs for which it was undertaken
• Time
• Cost
• Processes
• None of the given
We can classify the problems that affect software projects into _________ categories
• 3
• 4
• 5
• 6
All given below are the problems that affect software projects except:
• Product-related problems
• Technology-related problems
• Procedure-related problems
• People-related problems
--------------completion and settlement of the contract, including resolution of any open items.
• Contract Administration
• Source Selection
• None of the given
• Contract Closeout
Insufficient identification is a
• Technology-related problems
• Process-related problems
• People-related problems
• Product-related problems
Inefficient project management style is a
• Product-related problems
• Technology-related problems
• Process-related problems
• People-related problems
Unproductive work environment is a
• Technology-related problems
• Process-related problems
• People-related problems
• Product-related problems
__________contains an analysis of what went wrong, what went right, and what you could have done better in the software project.
• Prepare closedown report
• Identify learning
• Identify reusable software components
• Create reference material:
Decisions also have a --------------------- element to them—the “right” decision may not be the “best” decision if it is made too early or too late.
• Cost
• Quality
Time
•
None of the given
1. Which
organization has set the de facto standards for project management techniques?
A.
PMBOK
B.
PMO
C.
PMI
D.
PMA
Answer:
C
The
Project Management Institute (PMI) is the industry-recognized standard for
project management practices.
2.
The VP of marketing approaches you and requests that you change the visitor
logon screen on the company's website to include a username with at least six
characters. This is considered:
A.
Project initiation
B.
Ongoing operations
C. A
project
D.
Project execution
Answer:
B
Projects
exist to create a unique product or service. The logon screen in this question
is not a unique product. A minor change has been requested, indicating this is
an ongoing operation function. Some of the criteria for projects are that they
are unique, temporary with definitive start and end dates, and considered
complete when the project goals are achieved.
3.
Your company manufactures small kitchen appliances. They are introducing a new
product line of appliances in designer colors with distinctive features for
kitchens in small spaces. These new products will be offered indefinitely
starting with the spring catalog release. Which of the following is true?
A.
This is a project because this new product line has never been manufactured and
sold by this company before.
B.
This is an ongoing operation because the company is in the business of
manufacturing kitchen appliances. Introducing designer colors and features is
simply a new twist on an existing process.
C.
This is an ongoing operation because the new product line will be sold indefinitely.
It's not temporary.
D.
This is not a project or an ongoing operation. This is a new product
introduction not affecting ongoing operations.
Answer:
A
This
is a project. The product line is new, which implies this is a unique
product-it hasn't been done before. We can discern a definite start and end
date by the fact that the new appliances must be ready by the spring catalog
release.
4.
Your company manufactures small kitchen appliances. They are introducing a new
product line of appliances in designer colors with distinctive features for
kitchens in small spaces. These new products will be offered indefinitely
starting with the spring catalog release. In order to determine the
characteristics and features of the new product line, you will have to perform
which of the following?
A.
Fast tracking
B.
Consulting with the stakeholders
C.
Planning the project life cycle
D.
Progressive elaboration
Answer:
D
Progressive
elaboration is the process of determining the characteristics and features of
the product of the project. Progressive elaboration is carried out in steps in
detailed fashion.
5. A
project is considered successful when:
A.
The product of the project has been manufactured.
B.
The project sponsor announces the completion of the project.
C.
The product of the project is turned over to the operations area to handle the
ongoing aspects of the project.
D.
The project meets or exceeds the expectations of the stakeholders.
Answer:
D
A
project is considered successful when stakeholder needs and expectations are
met or exceeded.
6.
The VP of customer service has expressed concern over a project you're involved
in. His specific concern is that if the project is implemented as planned,
he'll have to purchase additional equipment to staff his customer service
center. The cost is substantial and was not taken into consideration in the
project budget. The project sponsor insists that the project must go forward as
originally planned or the customer will suffer. Which of the following is true?
A. The VP of customer service is correct. Since the cost was not
taken into account at the beginning of the project, the project should not go
forward as planned. Project initiation should be revisited to examine the
project plan and determine how changes can be made to accommodate customer
service.
B.
The conflict should be resolved in favor of the customer.
C.
The conflict should be resolved in favor of the project sponsor.
D.
The conflict should be resolved in favor of the VP of customer
service.
Answer:
B
Conflicts
between stakeholders should always be resolved in favor of the customer. This
question emphasizes the importance of identifying your stakeholders and their
needs as early as possible in the project. We'll discuss this more in later
chapters.
7.
Which of the following brings together a set of tools and techniques used to
describe, organize, and monitor the work of project activities?
A.
Project managers
B.
Guide to the PMBOK
C.
Project management
D.
Stakeholders
Answer:
C
Project
management brings together a set of tools and techniques to organize project
activities. Project managers are the ones responsible for managing the project
processes.
8.
What are the triple constraints?
A.
Time, schedules, and quality
B.
Time, availability, and quality
C.
Time, money, and schedules
D.
Time, money, and quality
Answer:
D
The
triple constraints that drive all projects are time, money, and quality.
9.
You are the project manager for a large construction project. The project
objective is to construct a set of outbuildings to house the Olympic support
team that will be arriving in your city 18 months from the project start date.
You've been given a budget of $12 million to complete this project. Resources
are easily attained. Which of the triple constraints is the primary constraint
for this project?
A.
Time, because the date cannot be moved
B.
Money, because the budget is set at $12 million
C.
Resources, because they're not fixed
D.
Quality, because the buildings have to be functional and safe
Answer:
A
The
primary constraint on this project is time because the date absolutely cannot
move. The Olympics are scheduled to begin on a certain date, and this can't be
changed. The budget is also a constraint because it's set at $12 million, but
in this example, it would be a secondary constraint. It's important that the
project manager understands the priority of the constraints and manages to
them.
10.
You are the project manager for a large construction project. The project
objective is to construct a set of outbuildings to house the Olympic support
team that will be arriving in your city 18 months from the project start date.
Resources are not readily available as they are currently assigned to other
projects. Jack, an expert crane operator, is needed for this project two months
from today. Which of the following skills will you use to get Jack assigned to
your project?
A.
Negotiation and influencing skills
B.
Communication and organizational skills
C.
Communication skills
D.
Problem-solving skills
Answer:
A
Negotiation
and influencing skills are needed to convince Jack's boss and come to agreement
concerning his assignment.
11.
You are a project manager with technical expertise in the pharmaceutical
industry. You've decided to try your hand at project management in the
entertainment industry. Which of the following is true?
A.
You will likely be successful because communication skills are your strong
suit. You anticipate having technical experts on your project team to address
industry specifics that you're not familiar with.
B.
You will likely be successful because your organizational skills are excellent.
You anticipate having technical experts on your project team to address
industry specifics that you're not familiar with.
C.
You will probably be successful because you have a friend in the entertainment
industry that has briefed you on all the important aspects of this project that
you'll need to know. You anticipate having technical experts on your project
team to address industry specifics that you're not familiar with.
D.
You will probably not be successful because you have little knowledge of the
entertainment industry even though you anticipate having technical experts on
your project team to address industry specifics that you're not familiar with.
Answer:
A
Project
management processes span industries. A project manager can take these skills
across industries and apply them successfully. Technical experience in the
industry doesn't hurt, but it's not required. The most important skill any
project manager can have is communication skills. Poor communication skills
might lead to an unsuccessful conclusion no matter how strong the project
manager's other skills are.
12.
You are managing a project to install a new postage software system that will
automatically print labels and administer postage for certified mailings,
overnight packages, and other special mailing needs. You've attempted to gain
the cooperation of the business analyst working on this project and need some
answers. She is elusive and tells you that this project is not her top
priority. To avoid situations like this in the future, you should:
A.
Establish the business analyst's duties well ahead of due dates and tell her
you'll be reporting on her performance to her functional manager.
B.
Establish the business analyst's duties well ahead of due dates and tell her
you are expecting her to meet these expectations because the customer is
counting on the project meeting due dates to save significant costs on their
annual mailings.
C.
Negotiate with the business analyst's functional manager during the planning
process to establish expectations and request to participate in the business
analyst's annual performance review.
D.
Negotiate with the business analyst's functional manager during the planning
process to establish expectations and inform the functional manager of the
requirements of the project. Agreement from the functional manager will assure
the cooperation of the business analyst.
Answer:
C
Negotiate
with the functional manager to participate in the business analyst's annual
performance review.
13.
The amount of authority a project manager possesses can be related to:
A.
The project manager's communication skills
B.
The organizational structure
C.
The amount of authority the manager of the project manager
possesses
D.
The project manager's influencing skills
Answer:
B
The
level of authority the project manager has is determined by the organizational
structure. For instance, in a functional organization, the project manager has
little to no authority, but in a projectized structure, the project
manager has full authority.
14.
What is one of the advantages of a functional structure?
A.
All employees report to one manager and have a clear chain of command.
B.
All employees report to two or more managers, but project team members show
loyalty to functional managers.
C.
The organization is focused on projects and project work.
D.
Teams are collocated.
Answer:
A
An
advantage for employees in a functional organization is that they have only one
supervisor and a clear chain of command exists.
15.
You have been assigned to a project in which the objectives are to direct
customer calls to an Interactive Voice Response system before being connected
to a live agent. You are in charge of the media communications for this
project. You report to the project manager in charge of this project and the VP
of marketing, who share responsibility for this project. Which organizational
structure do you work in?
A.
Functional organization
B.
Weak matrix organization
C. Projectized organization
D.
Balanced matrix organization
Answer:
D
Employees
in a balanced matrix often report to two or more managers. Functional managers
and project managers share authority and responsibility for projects. There is
a balance of power between the functional managers and project managers.
16.
You have been assigned to a project in which the objectives are to expand three
miles of the north-south highway through your city by two lanes in each
direction. You are in charge of the demolition phase of this project, and you
report to the project manager in charge of this project. You have been hired on
contract and will be released at the completion of the demolition phase. What
type of organizational structure does this represent?
A.
Functional organization
B.
Weak matrix organization
C. Projectized organization
D.
Balanced matrix organization
Answer:
C
Projectized organizations are focused on the project itself. One issue
with this type of structure is determining what to do with project team members
when they are not actively involved on the project. One alternative is to
release them when they are no longer needed.
17.
What are the five project management process groups, in order?
A.
Initiation, Executing, Planning, Controlling, and Closing
B.
Initiation, Controlling, Planning, Executing, and Closing
C.
Initiation, Planning, Controlling, Executing, and Closing
D.
Initiation, Planning, Executing, Controlling, and Closing
Answer:
D
Remember
the acronym that sounds like syrup of ipecac: IPECC.
18.
You have been assigned to a project in which the objectives are to expand three
miles of the north-south highway through your city by two lanes in each
direction. You are interested in implementing a new project process called design-build
in order to speed up the project schedule. The idea is that the construction
team will work on the first mile of the highway reconstruction at the same time
the design team is coming up with plans for the third mile of the
reconstruction rather than completing all design before any construction
begins. This is an example of:
A.
Managing the projects as a program
B.
Fast tracking
C.
Progressive elaboration
D.
Collocation
Answer:
B
Fast
tracking is starting a new phase before the phase you're working on is
completed. This compresses the project schedule, and the project is completed
sooner as a result.
19.
During which project management process are risk and stakeholder's ability to
influence project outcomes the highest at the beginning of the process?
A.
Planning
B.
Executing
C.
Initiation
D.
Controlling
Answer:
C
The
Initiation process is where stakeholders have the greatest ability to influence
outcomes of the project. Risk is highest during this stage because of the high
degree of unknown factors.
20.
You are a project manager working on gathering requirements and establishing
estimates for the project. Which process group are you in?
A.
Planning
B.
Executing
C.
Initiation
D.
Controlling
Answer:
A
The
Planning process is where requirements are fleshed out, stakeholders are
identified, and estimates on project costs and time are made.
1.
Basit is the project manager working on the Resource Planning process. He
should consider all of the following when developing the resource requirements
output except:
·
WBS
·
Supply purchase policies
·
Resource rates
·
Special knowledge and talents
2.
All of the following are true regarding the tools and techniques of activity
sequencing except:
·
GERT uses analogous methods
·
GERT allows for loops
·
GERT is a conditional diagramming method
·
GERT allows for conditional branches
3.
Pervaiz Elahi is a project manager for Changing Tides Video games. He has
produced a project network diagram and has updated the activity list. Which
process have he just finished?
·
The Activity Sequencing process, which identifies
all the specific activities of the project
·
The Activity Sequencing process, which identifies
all the activities dependences
·
The activity duration Estimating process, which
diagram project network time estimates
·
The activity duration Estimating process, which
identifies all the dependent activities of the project
4.
Pervaiz Elahi is a project manager for Changing Tides Video games. He has
gathered the inputs of for the Activity Duration Estimation process. He will employ
which tools and techniques to produce the outputs for this process?
· Activity list, analogous estimating, quality based durations, and
alternatives identification
· Activity list, analogous estimating, expert judgment, and quality
based durations
· Expert judgment, analogous estimating, quality based durations,
and reserve time
· Expert judgment, alternative identification, quality based
durations, and reserve time
5.
As a project manager, you know that all of the following are true concerning
analogous estimating techniques except:
·
It’s a qualitatively based estimating technique
·
It’s a Top-down estimating technique
·
It’s a tool and technique of Activity Duration
Estimating and Cost Estimating
·
It’s a form of expert judgment
6.
All of the following are true regarding parametric modeling except:
·
It’s a form of Top-down estimating
·
It’s a mathematical model
·
It’s a tool used to estimate project costs
·
It’s a tool used to estimate project time
7.
Which logical relationship does the PDM use most often?
·
Start to finish
·
Start to start
·
Finish to finish
·
Finish to start
8.
One of the most powerful leadership tools a project manager is has
his/her_______
·
Own knowledge
·
Own experience
·
Own behavior
·
Own reference
9.
The organization structure that provides the project manager with the most
authority over the project team is:
·
Functional
·
Balanced matrix
·
Strong matrix
·
Projectized
10. Using
an EFFORT RATIO for each type of change in________
·
Fuzzy logic sizing
·
Function point sizing
·
Changing sizing
·
Standard component sizing
11. What
is one of the problems with project management software?
·
The project manager manages the software instead of
the project
·
Project duration calculations are sometimes
approximate
·
You cannot override the project management software
decisions regarding schedule
·
It’s expensive and difficult to use
12. Which
of the following is displayed as an S-curve?
·
Gantt
·
Cost baseline
·
Critical path
·
PERT
13. If
you know expected value is 500 and the standard deviation is 12, you can ay
with approximately a 95 percent confidence rating which of the following?
·
The activity will take between 488 and 512 days
·
The activity will take between 464 and 536 days
·
The activity will take between 494 and 506 days
·
The activity will take between 476 and 524 days
14. If
your expected value is 110 and the standard deviation is 12, which of the
following is true?
·
There is approximately a 99 percent chance of
completing this activity between 86 and 134 days
·
There is approximately a 68 percent chance of
completing this activity between 98 and 122 days
·
There is approximately a 95 percent chance of
completing this activity between 98 and 122 days
·
There is approximately a 75 percent chance of
completing this activity between 86 and 134 days
15. Which
of the following tools and techniques shows the impacts of one decision over
another as well as the probability and cost of each risk along a logical path?
·
Simulation
·
Decision tree
·
Probability / impact risk matrix
·
Sensitivity analysis
16. All
of the following strategies are tools and techniques of Risk Response Planning
used to reduce or control risk except?
·
Mitigation
·
Simulation
·
Avoidance
·
Acceptance
17.
Object points are measurable code sections in an object-oriented programming
language, such as________
·
C++
·
Ada
·
Java
·
All of the given
18.
__________ involves determining what qualities are to be used to perform
project activities.
·
Resource planning
·
Cost estimating
·
Cost budgeting
·
Cost control
19. The
resources assigned to them will significantly influences the duration of most
activities.
·
True
·
False
20. Using
the intermediate COCOMO technique effort is calculated in___________
·
Two-step process
·
Three-step process
·
Four-step process
·
Five-step Process
1.
Which of the following is true regarding NPV?
·
NPV assumes reinvestment at the cost of capital
·
NPV decisions should be made based on the highest
value for all of the selections
·
NPV assumes reinvestment at the prevailing rate
·
NPV assumes reinvestment at the NPV rate
2.
Hasnain is a project manager for VU International. Since he doesn’t sleep much,
he get a lot of project work done. He is considering recommending a project
that cost s Rs. 575’000, and expected inflows are Rs. 25000 per quarter for the
first 2 years, then Rs. 75000 per quarter thereafter. What is the pay back period?
·
40 months
·
38 months
·
39 months
·
41 months
3.
Mathematical models using linear, dynamic, integer, or algorithm models are
considered:
·
Project selection criteria
·
A form of expert judgment
·
Project selection methods
·
A form of historical information
4. WBS Is Not:
·
The WBS should contains 100% of the work defined by
the scope or contract
·
Development of WBS should involve the entire
project team
·
A listing of tasks or activities
·
Should captures all deliverables (Internal,
External, Interim) in terms of work to be completed
5.
COMSAT project selection committee used a weighted scoring model and found that
project BAT, with a score of 54, should be chosen over the other competing
projects. Which of the following is true?
·
Weighted scoring models are a benefit measurement
method, which is tool and technique in the Initiation process
·
Weighted scoring models are constraint optimization
method, which is output of the Initiation process
·
Weighted scoring models are constraint optimization
method, which is tool and technique in the Initiation process
·
Weighted scoring models are a benefit measurement
method, which is output of the Initiation process
6.
Obtaining forma project plan approval and sign-off is important for all of the
following reason except:
·
Stakeholders are aware of the specific details
regarding project schedule, budgets, and risk
·
Stakeholders will be more likely to cooperate
·
Stakeholders are aware of the project details,
which makes them more likely to participate in future project decisions
·
Stakeholders are able to recommend a project planning methodology to follow throughout the remaining process
group
7.
All of the following are true regarding the project plan except:
·
Some of its input and outputs from other planning
processes
·
It’s used to guide the project Executing and
Controlling processes and it is the baseline used to measure project
performance
·
It consists of one document that should be formally
approved and signed by stakeholder
·
It contains things like the WBS, project schedule ,
and resource assignment
8. An
activities list is typically shown in this ways.
·
It can be shown as an outline
·
It can be shown as an outline or it can be
graphically presented
·
It can be graphically presented
·
None of the given
9.
Always remember that projects are in dynamic working environments, so try
to maintain flexibility in the work breakdown structure.
·
Always true
·
Always false
·
Sometimes true sometimes false
·
Depends on condition
10. To
create a schedule, you can use project management tools;
·
Gantt charts
·
Network-scheduling techniques
·
PERT
·
All of given
11. Usman is project manager for a new website for a
local zoo. He needs to perform Quantitative Risk Analysis. He will use all of
the following tools and techniques to accomplish this except:
·
Overall risk ranking for the project
·
List of prioritized risk
·
Inputs to other processes
·
List of risks for additional analysis and
management
12. Which
of the following describes the cost of quality associated with scrapping, rework,
and downtime?
·
Internal failure
·
External failure
·
Prevention cost
·
Appraisal cost
13.
Choudhary & Brothers hardware vendor left you voicemail saying that a
snowstorm in the Midwest will prevent your equipment from arriving on
time. You identified a risk response for this risk and have arranged for a
local company to lease you the needed equipment until yours arrives. This is an
example of which risk response strategy?
·
Transference
·
Acceptance
·
Mitigation
·
Avoidance
14. What
document outlines the action steps to be taken if an identified risk event
should occur?
·
Project plan
·
Corrective action Plan
·
Contingency Plan
·
Risk response plan
15. Tools
and techniques for risk identification include all but:
·
Checklist
·
Risk assessment
·
Interviewing
·
Assumption analysis
16. Tools
and techniques for Performance reporting are:
·
Performance review
·
Variance analysis
·
Trend analysis
·
All of the given
17.
Analogous estimating is a form of _________
·
Expert Judgment
·
Bottom up estimating
·
Delphi method
·
Computerized estimating
18.
____________ is another term for top down estimating.
·
Life cycle costing
·
Parametric modeling
·
Analogous estimating
·
Work package
19.
Assumptions generally involve:
·
A degree of risk
·
Financial control
·
Historical information
·
Lesson learned
20.
Receivers in the communications model filter their information through all of
the following except:
·
Culture
·
Knowledge of subject
·
Conflict
·
Language
1-
The presence of which of the given factors is mandatory in a quality assured
software
a) Change adaptive
b) Faulty
c) Correctness
d) Both Change adaptive and Correctness
2-
Which of the following testing technique is followed to ensure that the
software user requirements are being met?
a) White box
b) Gray box
c) Blue box
d) Black box
3-
Which of the following testing techniques is usually used during implementation
of individual modules?
a) White Box
b) Black Box
c) Integration testing
d) None of given
4-
How do the dynamic testers confirm that the executions of a program (other than
the expected execution of a program) are running accurately?
a) Some important program input are selected from the set of all and
executed
b) It is hard to confirm that
c) The execution of the program other that the intended execution is
useless to test
d) None of given
5-
The execution of a program is tested by a model based approach in-case of
a) Formal testing
b) Dynamic testing
c) Static testing
d) Unit testing
6-
What is the difference between formal methods and testing?
a) Formal methods aim at verification and proving correctness, while
testing can only show the presence of errors.
b) Testing is done only in the third phase of SDLC whereas Formal
methods are done in all the phases of SDLC except Testing phase
c) There is no big difference between the both
d) Testing can only be done after the requirements gathering phase of
SDLC whereas Formal methods can be applied before that.
7-
The main idea behind symbolic execution is to use symbolic values,
instead of actual data, as input values, and to represent the values of program
variables as symbolic expressions.
a) True
b) False
8- The purpose of mutation testing is
a) to help the tester develop effective tests or
b) to locate weaknesses in the test data used for the program never
accessed during execution
c) to locate weaknesses in the test data used in sections of the code
that are seldom accessed during execution
d) All of given
9- Which of the following is the example of mutation operators?
a) Replace each boolean sub expression with true and false.
b) Replace each arithmetic operation with another one, e.g. + with *, - and /.
c) Replace each boolean relation with another one, e.g. > with >=, == and <=.
d) All of given
10- Which of the following testing approach is used to test the software
functionality that previously worked as desired, stops working or no longer
works in the same way that was previously planned?
a) Integration testing
b) Unit testing
c) Regression testing
d) Dynamic testing
11- Which of the following can be a type of regression?
a) Local - changes introduce new bugs.
b) Unmasked - changes unmask previously existing bugs.
c) New feature regression
d) All of given
12- Which of the following testing is required when it needs to test the
software after combining the modules into a group?
a) Unit
b) Regression
c) White box
d) Integration
13- SQA encompasses the entire software development process
a) True
b) False
14- The process of software quality assurance (SQA) is designed to
prevent software defects and inefficiencies
a) True
b) False
15- There is no difference between software quality assurance and
software testing
a) True
b) False
The distinguishing characteristics of a software
product are _________
Select
correct option:
Function
points and lines of code
all of
the given
None of
given
The
distinguishing characteristics of a software product are the cyclomatic
complexity,
cohesion, function points, and lines of
Question
# 3 of 10
Insufficient
identification is a
Select
correct option:
Technology-related
problems
People-related
problems
Product-related
problems
Insufficient identification: Unidentified, partially identified,
and unplanned
risks
pose a threat to the success of a software project. You need to intensively
identify
risks and evolve a risk management plan such that the project is
completed
successfully, on time.
Question
# 4 of 10
________of
the system is an effort to better understand data and control flow, functional
processing, operational behavior, and information content
Select
correct option:
Specifications
Design
Model
Evaluation
and Synthesis
During the evaluation and solution synthesis activity, the analyst
creates
models of the system in an effort to better understand data and
control
flow, functional processing, operational behavior, and
information
content. The model serves as a foundation for software
design
and as the basis for the creation of specifications for the
Software.
The customer may be unsure of precisely what is required.
The
developer
Question
# 5 of 10
These all
are Product Transition Factors except
Select
correct option:
Interoperability
Configurability
Expandability
Question
# 6 of 10
Inefficient
project management style is a
Select
correct option:
Product-related
problems
Technology-related
problems
Process-related
problems
People-related problems
Inefficient
project management style: the project manager needs to lead by
example.
The team members absorb the work culture, work ethic, and attitude
of the
project manager and implement it in their work style. If you display a
lack
of leadership qualities and weak ideals, the motivation levels decrease
across
software team.
Question
# 7 of 10
Finally,
the specification includes a ________
Select
correct option:
Bibliography
Appendix
Both Bibliography and Appendix
Reference
Finally,
the specification includes a Bibliography and Appendix.
Question
# 8 of 10
Software
design is actually a multi step process that focuses on distinct attributes of
a program, these are
Select
correct option:
Data
structure, and Software architecture
Interface
representations, and procedural detail
Both of given
None of
given
Software design is actually a multi step process that focuses on
four
distinct
attributes of a program:
– Data structure,
– Software architecture,
– Interface representations, and procedural (algorithmic) detail.
Question
# 9 of 10
Software
requirements analysis may be divided into______ areas of effort
Select
correct option:
4
5
6
7
Software requirements analysis may be divided into five areas of
effort:
(1)
Problem recognition,
(2)
Evaluation and synthesis,
(3)
Modeling
(4)
Specification, and
(5)
Review
Question
# 10 of 10
McCall
(MCC77) and his colleagues proposed some software quality factors based on
_________ most important aspects of a software product:
Select
correct option:
4
3
6
5
There
are a number of factors that determine the quality of a software product.
These
factors can be measured either directly or indirectly. McCall (MCC77) and
his
colleagues proposed some software quality factors based on three most
important
aspects of a software product:
1.
Product operation
2.
Product revision and
3.
Product transition
Question
# 1 of __________contains an analysis of what went wrong, what went right, and
what you could have done better in the software project.
Select
correct option:
Prepare closedown report
Identify
learning
Identify
reusable software components
Create
reference material:
Prepare
closedown report: The project closedown report contains the results
of
the
causal analysis that you do for the project. This contains an analysis of what
went
wrong, what went right, and what you could have done better in the software
project. contains an analysis of what went wrong, what went right, and what
Question
# 2 of 10
Project
Quality Management includes the --------------- required to ensure that the project
will satisfy the needs for which it was undertaken
Select
correct option:
Time
Cost
None of
the given
Project
Quality Management includes the processes required to ensure that the
project
will satisfy the needs for which it was undertaken. It includes “all
activities
of the overall management function that determine the quality policy,
objectives,
and responsibilities and implements them by means such as quality
planning,
quality assurance, quality control, and quality improvement, within the
quality
system.
Question
# 3 of 10
--------------completion
and settlement of the contract, including resolution of any open items.
Select
correct option:
Contract
Administration
Source
Selection
None of
the given
Contract Closeout
Contract
Closeout—completion
and settlement of the contract, including
resolution
of any open items
Question
# 4 of 10 ( Start time: 11:31:37 PM ) Total Marks: 1
---------------managing
the relationship with the seller.
Select
correct option:
Source
Selection
None of
the given
Contract
Closeout
Contract
Administration—managing the relationship with the seller.
Question
# 5 of 10
Decisions
also have a --------------------- element to them—the “right” decision may not
be the “best” decision if it is made too early or too late.
Select
correct option:
Cost
Quality
Time
None of
the given
Decisions
also have a time element to them—the “right” decision may not
be
the “best” decision if it is made too early or too late.
Question
# 6 of 10
-----------is
the ability to encourage by "push or pull" technical people to
produce to their best ability.
Select
correct option:
Evaluating
Motivation
None of
the given
Monitoring
Motivation: The
ability to encourage (by "push or pull") technical people to
produce
to their best ability.
Question
# 7 of 10
Unproductive
work environment is a
Select
correct option:
Technology-related
problems
Process-related
problems
Product-related
problems
Unproductive
work environment: The work environment is a major factor
that
affects the productivity of the development team. For example, a noisy or
cramped
workspace decreases the motivation levels of the employees.
Similarly,
unfriendly organizational policies also lower the motivation of the
team
members. As the project manager, you need to ensure that the team is
protected
from harmful external make the workspace friendly to work in.
Question
# 8 of 10
Most
software project manager’s practice a lot of management techniques that are of
doubtful authenticity are called
Select
correct option:
Project
management tools
Project management myths
Project
management thumb rules
Project
management fundamentals
Project
Management Myths
In
most cases, you learn the skills required to manage a software project while on
the
job. As a result, most software project managers practice a lot of management
techniques
that are of doubtful authenticity. Many software project managers
learn
about the so-called management skills and concepts that are actually myths.
Question
# 9 of 10
Strong
leadership motivation may sound an obvious trait for a ---------------------.
Select
correct option:
Leader
Manager
Specialist
None of
the given
Strong
leadership motivation may sound an obvious trait for a leader. After all,
only
those who want the weighty responsibilities and grueling pressures of
leadership
are likely to strive for it.
Question
# 10 of
We can
classify the problems that affect software projects into _________ categories
Select
correct option:
3
4
5
6
You
can classify the problems that affect software projects into the following four
categories:
• People-related problems
• Process-related problems
• Product-related problems
• Technology-related problems
Question
# 1 of 10
Insufficient
identification is a
Select
correct option:
Technology-related
problems
People-related
problems
Product-related
problems
Question
# 2 of 10
Technology-related
problems include _______
Select
correct option:
Overestimated
savings from reusable components and new tools and methods
Switching
tools in mid way
Integrating
different software products in cross-platform implementation
All of given
Question
# 3 of 10
What is
one of the problems with project management software?
Select
correct option:
The project manager manages the software instead of
the project
Project
duration calculations are sometimes approximate
You can
not override the project management software decisions regarding schedules
It’s
expensive and difficult to use
Question
# 4 of 10
The
check-in and checkout facilities provide___________
Select
correct option:
Best control
Component
control
SCI
control
Synchronization control
Question
# 5 of 10
McCall
(MCC77) and his colleagues proposed some software quality factors based on most
important aspects of a software product:
Select
correct option:
Product
operation
Product
revision and
Product
transition
Synchronization
control helps to ensure that parallel changes performed by two different people
do ___________.
Select
correct option:
Not overwrite one another
Overwrite
one another
May
overwrite one another
None of
given
The code
generation step performs the task
Select
correct option:
Translated
specification into a machine-readable form
Translated design into a machine-readable form
Translated
requirements into a machine-readable form
Translated
user data into a machine-readable form
Question
# 8 of 10
Before
requirements can be analyzed, modeled, or specified they must be gathered
through a/an _________
Select
correct option:
Elicitation process
Interviewing
Meeting
None of
given
Question
# 9 of 10
The
quality of software is said to be high if it meets the
Select
correct option:
Standards,
defined for the product
Procedures,
defined for the product
Standards and procedures, defined for the product
Design
defined for product
Question
# 10 of 10
A review
of the Software Requirements Specification is conducted by ________
Select
correct option:
Software
developer
Customer
Both the software developer and the customer
Top level
management
Question
# 1 of 10
The British Standards Institution (1986) has stated
the quality as
Select
correct option:
• The
ability of a software product to satisfy its specified requirements
• "An
inherent or distinguishing characteristic or a property"
• “Quality is in the eye of the beholder, a
matter, of the client's judgment.”
• All
of the given
The
distinguishing characteristics of a software product are the cyclomatic
complexity,
cohesion, function points, and lines of code. These characteristics of
a
software product define the quality of the product.
• The US DOD (1988) defines software quality rather simply as:
–
The ability of a software product to satisfy its specified requirements.
• The British Standards Institution (1986) has stated that:
–
“Quality is in the eye of the beholder, a matter, of the client's judgment.”
Question # 2 of 10
The check-in and checkout facilities
provide___________
Select
correct option:
• Best
control
• Best
control
• SCI
control
Synchronization control
The
check-in and checkout facilities provide synchronization control. Synchronization
control helps to ensure that parallel changes
Question # 3 of 10 A baseline version __________
Select
correct option:
• Have
a short life
• Can
be assigned version numbers 3.2
• Tested and certified version of a system
• Survive
only during bug fixing
Question # 4 of 10
You can use the Item Traceability Matrix to
identify _______ at the end of each phase
Select
correct option:
• SCIs
• SCM
• Design
• Construction
You
can use the Item Traceability Matrix to identify SCIs at the end of each phase
Question # 5 of 10
Defined scope is a
Select
correct option:
• Technology-related
problems
• Product-related problems
• Process-related
problems
• People-related
problems
Question
# 6 of 10 ( Start time: 09:33:13 AM ) Total
Marks: 1
Software requirements engineering is a process of
all except
Select
correct option:
• Discovery
• Refinement
• Design
• Specification
Software
requirements engineering is a process of discovery, refinement,
modeling
and specification.
Question # 7 of 10
The model serves as the basis for the creation of
________ for the Software.
Select
correct option:
• Design
• Maintenance
• Testing
• Specifications
The
model serves as a foundation for software design and as the basis for the
creation of specifications for the Software.
Question # 8 of 10
Most software project manager’s practice a lot of
management techniques that are of doubtful authenticity are called
Select
correct option:
• Project
management tools
• Project management myths
• Project
management thumb rules
• Project
management fundamentals
Question # 9 of 10
The Introduction of the software requirements
specification states the
Select
correct option:
• Goals
• Objective
• Design
• Goals and objectives of the software
Question # 10 of 10
The quality of software is said to be high if it
meets the
Select
correct option:
• Standards,
defined for the product
• Procedures, defined for the product
• Standards
and procedures, defined for the product
• Design
defined for product
Question
# 1
Using
PERT and CPM, -----------------------, helps you complete a project on time. By
using these techniques, you can determine the latest time by when an activity
should start to be completed on time
·
Individually
·
Combine
·
Individually and combine
·
None of the above
Using
PERT and CPM, individually or in combination, helps you complete a project on
time. By using these techniques, you can determine the latest time by when an
activity should start to be completed on time. (P# 296)
Question
# 2
Each
…………. can be subdivided into sub tasks.
·
Program
·
Task
·
Project
·
None of the above
Each
task can be subdivided into sub tasks. Fro example, in a general software project,
a task is to perform project analysis. You may also consider studying the
organizational objectives and preparing a project proposal to present to the
client. (P# 275)
Question
# 3
Predecessor
activities need to ------------ before the next can begin. After a predecessor
activity is completed, the successor activity becomes the predecessor for
another activity
·
Both start and end
·
End
·
Start
·
None
Predecessor
activities need to end before the next can begin. After a predecessor activity
is completed, the successor activity becomes the predecessor for another
activity (P# 297)
Question
# 4
Efficiency
with which a program runs on different platforms or operating systems is
Reusability
► True
► False
► True
► False
Portability Efficiency
with which a program runs on different platforms or operating systems
Reusability Extent
to which the program can be used in more than one program or system (P# 121 )
Question
# 5
Which of the items listed below is not one of the software engineering layers?
► Process
► Manufacturing
► Methods
► Tools
Software
engineering layers (P# 130)
Process
A
quality focus
Method
Tools
Question
# 6
-------------------is a software engineering task that bridges the gap between system level requirements engineering and software design.
►Cost Analysis
►Design analysis
►Risk analysis
►Requirements analysis
Requirements
analysis is a software engineering task that bridges the gap between system
level requirements engineering and software design (P# 93)
Question
# 7
---------- is path finding,----------- is path following
---------- is path finding,----------- is path following
► Leadership, Management
► Leader, Leadership
► Management, Leadership
► Manager, Management
► Leader, Leadership
► Management, Leadership
► Manager, Management
Leadership
is path finding
Management
is path following
Management
is about doing things right
Leadership
is about doing the right things (P# 45)
Question
# 8
Discrete
portions of the project that can be charged to a single organization are called
-----------------
► Work packages
► Deliverables
► Tasks
► Activities
Work
packages are:
Discrete
portions of the project that can be charged to a single organization (P# 250)
Question
# 9
The
first step in project planning is to --------------------
► Determine the budget
► Select a team organizational model
► Determine the project constraints
► Establish the objectives and scope
Question
# 10
The
software quality assurance activity which is performed to check errors in
logic, function, or implementation for any representation of the software is
called :
► Inspection
► Formal technical review(s)
► Walkthrough
► Auditing
Formal
Technical Reviews
One
of the most common, yet important, software quality assurance activity
performed is FTR. This activity is performed to check errors in logic,
function, or implementation for any representation of the software. (P# 126)
Q 1.
All of the following are types of project closures or endings except:
1.
Addition
2.
Integration
3.
Verification
4.
Extiction
Q 2. The
primary focus of _______________ is to ensure that the final software product
offers all the functionality and performance that the customer wanted
1.
Training test
2.
User acceptance test
3.
Implementation test
4.
Support test
The
primary focus of user acceptance test is to ensure that the final software
product offers all the functionality and performance that the customer wanted.
Therefore, the customer tests the software product for issues such as
aesthetics, user friendless, and scalability.
Q 3. Technology-related
problems include _______
1.
Overestimated savings from reusable
components and new tools and methods
2.
Switching tools in mid way
3.
Integrating different software products in
cross-platform implementation
4.
All of given
Technology-related
problems
1.
Overestimated savings from reusable components and new tools and methods:
2.
Switching tools in mid way
3.
Integrating different software products in cross-platform implementation
Q 4. Most
software project manager’s practice a lot of management techniques that are of
doubtful authenticity are called
1.
Project management tools
2.
Project management myths
3.
Project management thumb rules
4.
Project management fundamentals
Project
Management Myths
In
most cases, you learn the skills required to manage a software project while on
the job. As a result, most software project managers practice a lot of
management techniques that are of doubtful authenticity. Many software project
managers learn about the so-called management skills and concepts that are
actually myths.
Q 5. Ineffective
project sponsorship by management is a
1.
Technology-related problems
2.
Process-related problems
3.
People-related problems
4.
Product-related problems
People-related
problems are
• Low motivation
• Problem employees
• Unproductive work environment
• Inefficient project management style:
• Lack of stakeholder interest
Ineffective
project sponsorship by management
Q 6. Unproductive
work environment is a
1.
Technology-related problems
2.
Process-related problems
3.
People-related problems
o
Product-related problems
People-related
problems are
• Low motivation
• Problem employees
• Unproductive work environment
• Inefficient project management style:
• Lack of stakeholder interest
Ineffective
project sponsorship by management
Q 7. Before
requirements can be analyzed, modeled, or specified they must be gathered
through a/an _________
1.
Elicitation process
o
Interviewing
o
Meeting
o
None of given
Requirements
Elicitation for Software
Before
requirements can be analyzed, modeled, or specified they must be gathered
through an elicitation process. A customer has a problem that may be amenable
to a computer-based solution. A developer responds to the customer's request
for help.
Q 8
. ________of
the system is an effort to better understand data and control flow, functional
processing, operational behavior, and information content
1.
Specifications
2.
Design
3.
Model
4.
Evaluation and Synthesis
During
the evaluation and solution synthesis activity, the analyst creates models of
the system in an effort to better understand data and control flow, functional
processing, operational behavior, and information content.
Q 9 Both
the software engineer and customer take an active role in software requirements
engineering-a set of activities that is often referred to as
1.
Analysis
o
Specification
o
Design
o
System acceptance
Both
the software engineer and customer take an active role in software requirements
engineering-a set of activities that is often referred to as analysis.
Q
10. A
review of the Software Requirements Specification is conducted by ________
1.
Software developer
2.
Customer
3.
Both the software developer and
the customer
o
Top level management
A
review of the Software Requirements Specification (and/or prototype) is conducted by both the software developer and
the customer.